Town Projects
Each year, Council approves a variety of town projects aimed at maintaining and improving services for the residents of Perth. These projects focus on enhancing infrastructure, public facilities, and the overall quality of life in our community. Below is a list of the approved projects for 2026.
Roads/Water/Sewer
|
Project |
Description |
|---|---|
| Craig Street Upgrades | Paving to be completed Summer 2026 |
| Robinson Street Upgrades | Reconstruction in Summer of 2026 with full reconstruction of infrastructure |
| Thom Street Upgrades | Reconstruction in Summer of 2026 with full reconstruction of infrastructure |
| Tay Basin Parking Lot | |
| Engineering Road Work | Assembling library of reconstruction projects and designs ahead of the tendering of road projects |
| Hwy 7 Water & Sewer Study | Design of Water, Sanitary, and Storm Sewer networks in preparation for the reconstruction of Highway 7 by the province |
| Transportation Master Plan | |
| Infrastructure Master Plan | |
| Little Tay Bridge Rehabilitation | Rehabilitation of Double Arch Stone Bridge on Gore Street |
| Rainbow Bridge Rehabilitation | Rehabilitation of Rainbow Bridge in Stewart Park |
| Perkins Genset Generator 1999 Jamesville Pumping Stn 100 KW | Replacement of backup power system |
| Road Line Painting | This is an annual activity to paint road lines including parking spaces, loading zones and handicapped spaces |
| Road Crack Sealing | This is an annual activity to seal cracks in the roads |
| Scada Software Upgrade | On-going maintenance Water Treatment Plant operating hardware and software |
| Storm Sewer - Rural Ditching Maintenance | Annual cleaning of municipal ditches |
| UPS for Traffic Light | Upgrade to the emergency power system for traffic control |
| Water & Sewer Development Charge | |
| Water Treatment Plant Reservoir Valves | Replacement of the valves and actuator |
Development
|
Project |
Description |
|---|---|
| Updates to the Zoning By-law | Review and cross-check of the Official Plan, with updates to Zoning By-law to ensure cohesiveness. Review of land uses and their compatibilities, and provide update to regulations as per the Province. |
| Citywide Planning Software | Tracking, mapping and submission system for building and planning to submit applications online. |
Facilities
|
Project |
Description |
|---|---|
| Indoor Pool Boiler | Replacement one of two boilers during annual shutdown |
| Arena Plumbing | Upgrading aged plumbing throughout the washrooms and changerooms |
| Environmental Services Garage | Planning for updated facility |
| Repointing of Stonework | Repointing stonework at base of Town Hall |
| Town Hall Reconfiguration | Re-vamping front entrance/lobby |
Parks/Recreation
|
Project |
Description |
|---|---|
| Conlon Farm Splash Pad | Installation of new splash pad features to replace aging infrastructure |
| Dog Park Upgrades | Installing trees and shrubs and building a shade shelter |
Tourism/Economic Development Projects
|
Project |
Description |
|---|---|
| Economic Development Initiatives | Implementation of Economic Development Marketing Plan |
| Museum 100th Anniversary Celebrations |
Other
|
Project |
Description |
|---|---|
| Representation in Scotland | Invitation from Perth and Kinross to celebrate their 25 years of Twinning and Friendship between our two cities. Deputy Mayor to attend. |
Contact Us
Town of Perth
Town Hall
80 Gore Street East
Perth, Ontario
K7H 1H9
Telephone: (613) 267-3311
Fax: (613) 267-5635
Email